How we took a clinical-stage startup from zero documentation to a fully audit-ready QMS before their first production run.
Zero to Ready
Complete QMS before first run
5 Hubs
Role-based digital QMS deployed
25+
Tablet-ready forms active
The Situation
A clinical-stage company was launching a canned functional beverage using proprietary oxygen-enrichment technology. With a six-person team, a facility in Tacoma producing 17,000 cans per day, and a hard production start date, they had exactly one problem: zero documentation, zero compliance systems, and zero time to build them the traditional way.
They needed to go from nothing to fully audit-ready — Food Safety Plan, SOP library, sanitation compliance program, and a functioning digital QMS on the floor — before their first production run. The stakes were real: a failed FDA inspection or a documentation gap would shut them down on day one.
What We Built
Working from a blank slate, Snackteva built a complete compliance infrastructure in weeks rather than months:
- Food Safety Plan v4.0 — 21-entry hazard matrix, PCQI-authored with exact CFR citations, regulation-native from day one
- 16-SOP Manual with 30+ associated form templates covering every production and safety function
- Sanitation Compliance Program — CIP/COP protocols, ATP monitoring procedures, chemical concentration records
- 40-Item Startup Readiness Assessment — a systematic pre-launch checklist covering every compliance requirement
- SnacktevaOS Digital QMS — 5 role-based JotForm hubs (Operator, QA, Sanitation, Warehouse, Supervisor) with 25+ tablet-ready forms deployed to the production floor
Documents were version-controlled from the start (v1.0 → v4.0), with AI-assisted iteration that maintained regulatory precision at every revision cycle.
The Result
The company went from zero to fully audit-ready before their first production run. Their digital QMS was live on the floor from day one. Operators were filling out batch records, sanitation logs, and CCP monitoring forms on tablets instead of paper. Every record fed directly into an audit-ready data structure.
This is what SnacktevaOS is built to do: compress a compliance build that typically takes six months into weeks, without cutting corners on regulatory accuracy.